Entire space taken down to studs. Reframed and enlarged shower space to make it open and walk in. Bathroom door was enlarged. Raised entire ceiling to make space feel large and open, reframed window, opened up skylight and redesigned the vanity space.
Role - Layout, specifications and design of floorpan for optimal flow and use. Worked as designer, project manager and sourced materials.